;

Route 677 Bridge over Herring Creek in Caroline to close Monday for pipe replacement

by | Nov 28, 2020 | Traffic

 

VDOT will close Route 677 (Camp Road) at the bridge over Herring Creek in Caroline County this Monday to replace two large drainage pipes with a slightly larger concrete box culvert.

Camp Road will be closed to traffic between Route 694 (Courtney Road) and Route 693 (Herring Creek Road) for approximately three months. During construction, drivers will be detoured 5 miles around the closure.

Signs will be posted along the recommended detour route:

  • Route 694 (Courtney Road)
  • Route 601 (Edgar Road)
  • Route 693 (Herring Creek Road)

VDOT will replace two deteriorated 5-foot concrete pipes installed in 1964 with a single 8-foot by 6-foot concrete box culvert. The larger box culvert will improve drainage on Camp Road.

Weather permitting, construction is estimated to be complete in approximately 12 weeks and Camp Road will road reopen to traffic in early 2021.

According to a VDOT traffic count, approximately 58 vehicles a day travel this portion of Camp Road.

511Virginia

 

Motorists can find real-time information on lane closures, work zones, traffic and other incidents on 511Virginia.

Subscribe To Daily News Updates

Join our mailing list to receive the latest news from The Free Press

You have Successfully Subscribed!

Share This