Get the daily newsletter!

WATCH: Final beam installed on Chatham Bridge project

Video courtesy VDOT-Fredericksburg District

The structure over the Rappahannock River now connects the city and Stafford. It will open to traffic with a new, separated pedestrian path in October, like this October, October 2021.

https://fb.watch/4U0TpfjUid/

Pin It on Pinterest

Share This