;

WATCH: Final beam installed on Chatham Bridge project

by | Apr 15, 2021 | Traffic

Video courtesy VDOT-Fredericksburg District

The structure over the Rappahannock River now connects the city and Stafford. It will open to traffic with a new, separated pedestrian path in October, like this October, October 2021.

https://fb.watch/4U0TpfjUid/

Subscribe To Daily News Updates

Join our mailing list to receive the latest news from The Free Press

You have Successfully Subscribed!

Share This